Dongguan longstargift Co., Ltd. received a large order again in July. The customer of this order is Mr. inamoto, a Japanese customer who has cooperated with our company for many years. Mr. inamoto operates a large corporation in Taitung District, Tokyo, Japan. The main product is electronic light-emitting products, and the LED ice cube produced by our company is one of the products that have been cooperating with Mr. inamoto for many years. The annual demand is about 1million. This time, Mr. inamoto's purchase volume is 300000.
This LED ice cube, both in appearance and function, is designed by Mr. inamoto himself. This product is a children's toy. When the ice cube is placed in the water, it will automatically emit dazzling light. With different functions, it is divided into single color and multi color. Once launched, this product is very popular with children, because with this product, children prefer to take a bath.
LED ice cubes are square, with cute patterns, which are really unforgettable. The material of this product belongs to PC grade, which can be placed in drinks and cocktails. Under the light, LED ice flashes a dazzling light in the glass, giving people a different feeling.
This order volume is huge, but because he has a good foundation of cooperation with Mr. inamoto, he has no doubt about our delivery ability. The agreed delivery time is 1 month, and we need to ship goods according to color and pattern. These requirements are very simple for us. We assure Mr. inamoto that every process from proofing, production, printing, assembly, inspection and packaging will be carried out in strict accordance with the requirements. We are confident that the defective rate of products will be controlled at 3 / 10000.
Our new factory is just used to produce LED ice cubes, and nearly 30 workers are busy every day. You should arrange the work stations according to the product installation sequence, and be sure to complete the production task before the specified delivery date. This opportunity can be a good display of the distribution capacity of our processing workshop.
Post time: Aug-04-2022